Friday – August 7, 2026
Oil & Gas

Motive APAC Completes Full-Scope TIC Campaign Across Three Regional Projects

(Credit: Motive)
(Image Credit: Motive)

Motive has completed a comprehensive, month-long Testing, Inspection, and Certification (TIC) campaign across three major regional projects in APAC.

In the energy sector, structural integrity and lifting safety are non-negotiable. Over the course of the month, the APAC team rolled out a comprehensive range of specialized testing, inspection, and certification services across several projects:

  • LARS Umbilical Wire Rope Installation: Using a Motive 75Te Spooling Winch with controlled 3Te back-tension to safely spool 1,700 m of 41.5 mm diameter wire rope
  • Inspection of Lifting Gear and Equipment: Rigorous compliance checks on wire rope slings, lifting slings, shackles, lanyards, and man-riding platforms to guarantee safety during critical lifts
  • Non-Destructive Testing (NDT): Using Magnetic Particle Inspection (MPI) instruments to identify cracks, corrosion, or hidden flaws in a Knuckle Boom Main Crane Hook, and conducting eddy current testing of critical weldments of the client’s umbilical reel onsite
  • Load Testing: Validating equipment load capabilities using specialized waterbags and load cells for certified strength and weight validation
  • Socketing of Wire Rope Termination: Carried out by specialists to ensure secure, high-strength connections

The Engineering and Project Management teams conducted an in-depth analysis of the umbilical spooling and the inspection requirements. By evaluating environmental conditions, location constraints, and resource availability, Motive delivered a tailored, cost-effective proposal for the client.

Offshore Source keeps you updated with relevant information concerning the Offshore Energy Sector.

Subscribe to Offshore Source Newsletter today!