The contract is set to begin in Q3 2027 with an estimated duration of 40–60 days.
The 2014-built Noble Intrepid is a Gusto MSC CJ70 X150 MD jackup rig capable of accommodating 150 people, with a maximum water depth capability of 492 ft and a maximum drilling depth of 40,000 ft.