Each clamp featured a two-piece bolted assembly shaped to fit around existing subsea infrastructure. This allowed the sections to be positioned and secured without needing access from the end of the pipework.
The components were manufactured in PP30GF, a 30% glass-fiber reinforced polypropylene selected for its water and corrosion resistance. Additive manufacturing enabled the bespoke geometry to be produced directly from the digital design, without dedicated mold tooling.
The project demonstrates how large-format additive manufacturing can support offshore applications requiring custom geometry, low quantities, and short delivery timeframes.