Temporary equipment staged on the pad to support drilling and well testing will include a drill rig and pipe, a completion rig, mud tanks and pumps, boilers, generators and cement silos, along with a line heater, a liquids/gas separator, a flare, and a 400-barrel water tank. The wells will be drilled into state subsurface lease ADL 21128, located within the Beluga River unit on the west side of Cook Inlet, about two miles west of the mouth of the Beluga River.