Oil & Gas News

Eni has started the early production phase from the Miztón field in Area 1, located in the Campeche Bay offshore Mexico. This is the first step in the development of Area 1, estimated to hold 2.1 billion of oil equivalent in place (90% oil) in the Amoca, Miztón and Tecoalli fields. Eni acquired Area 1 in a competitive bid round in September 2015.

A recent week-long operation included accurate remote configuration of the positioning systems onboard the FPSO, the assisting anchor handling vessel and the dive support vessel, with no Fugro survey crew offshore. This is the first fully remote FPSO heading control operation in the North Sea, enabling significant operational cost savings and de-risking through a reduction of offshore personnel.

NKT has been awarded a turnkey project from Lundin Norway AS for the 132 kV high-voltage power cable connecting the Edvard Grieg oil and gas production platform to the Johan Sverdrup field center. The power cable solution will finalize the Utsira High Power Hub Project to power several oil and gas fields with renewable power from shore.

Offshore Source Logo

Offshore Source keeps you updated with relevant information concerning the Offshore Energy Sector.

Any views or opinions represented on this website belong solely to the author and do not represent those of the people, institutions or organizations that Offshore Source or collaborators may or may not have been associated with in a professional or personal capacity, unless explicitly stated.

Corporate Offices

Technology Systems Corporation
8502 SW Kansas Ave
Stuart, FL 34997

info@tscpublishing.com